About EUDET
Activities
Participants
Documents
Internal
Conferences
Calendar
News
Contact
TPC
Introduction
Field Cage
ADC Electronics
TDC Electronics
Milestones
Documents
Talks
Participants
Links
EUDET
Activities
JRA2
TPC
Talks
·
Presentations
EUDET Talks
2010.09.30:
TPC Task: the past and the present
Klaus Dehmelt
2010.09.29:
Possible layout for LPTPC readout system based on 16-ch S-Altro
Leif Jönsson
2010.09.29:
Results with Micromegas modules at LPTPC
Wenxin Wang
2010.09.29:
Results from recent J-GEM test at LPTPC
Takeshi Matsuda
2010.09.29:
Recent Developments and Status of MarlinTPC and Related Software
Ralf Diener
2010.09.29:
The Infrastructure for the Large Prototype of a TPC at DESY
Klaus Dehmelt
2009.10.20:
TPC task status report
Klaus Dehmelt
2009.10.19:
Status of the LP-TPC at DESY
Klaus Dehmelt
2009.10.19:
Data-driven readout electronics for ILC TPC
Alexander Kaukher
2009.10.19:
S-ALTRO integration and system level studies
Magnus Mager
2008.10.07:
TPC Task Status Report
Klaus Dehmelt
2008.10.06:
Status of TPC-electronics with Time-to-Digit Converters
Alexander Kaukher
2008.10.06:
Front end electronics for the GEM readout panels
Anders Oskarsson
2008.10.06:
TPC pad readout electronics
Paul Aspell
2008.10.06:
Status of Micromegas readout panel for the LC TPC
Paul Colas
2008.10.06:
Status of the large TPC prototype
Klaus Dehmelt
2007.10.09:
Status report TPC task
Klaus Dehmelt
2007.10.08:
TDC electronics for the TPC
Alexander Kaukher
2007.10.08:
Electronics for the TPC
Leif Jönsson
2007.10.08:
The TPC fieldcage
Ralf Diener
2007.10.08:
Status and plans for the DAQ system
Ulf Mjörnmark
2006.10.19:
JRA2 Status TPC
Leif Jönsson
2006.10.18:
The readout of the LC-TPC
Leif Jönsson
2006.10.18:
A TDC readout for the TPC
Alexander Kaukher
2006.10.18:
The TPC field cage
Peter Schade (DESY)
Related Talks
2010-03-27
Large TPC Prototype of LCTPC
LCWS10 and ILC10
, Beijing, China
Klaus Dehmelt
2010-02-16
A Large TPC Prototype for an ILC Detector
12th Vienna Conference on Instrumentation
, Vienna, Austria
Peter Schade
2009-09-30
A Large TPC Prototype at DESY
ALCPG 2009
, Albuquerque, USA
Klaus Dehmelt
2009-07-18
A Large TPC Prototype for an ILC Detector
EPS HEP 2009
, Krakow, Poland
Klaus Dehmelt
2009-03-12
A large prototype of a TPC for an ILC detector
TIPP09: Technology and Instrumentation in Particle Physics
, Tsukuba, Japan
Klaus Dehmelt
2008-11-19
GEM Studies for LCTPC
LCWS08
, Chicago, USA
Lea Hallermann
2008-11-19
TPC readout electronics with Time-to-Digital Converters
LCWS08
, Chicago, USA
Alexander Kaukher
2008-11-19
The Large TPC Prototype: Infrastructure/ Status/ Plans
LCWS08
, Chicago, USA
Ties Behnke
2008-10-18:
TPCs for Linear Colliders
Special Focus Workshop: Micro Pattern Gas- and Silicon Detectors for Tracking - I
at the
IEEE Nuclear Science Symposium 2008, Dresden, Germany
Takeshi Matsuda
2008-10-13:
Application of MPGD to TPC for the ILC
2nd RD51 Collaboration Meeting
, Paris, France
Takeshi Matsuda
2008-06-11:
Status of the Large Prototype TPC
ECFA International Linear Collider Workshop 2008
, Warsaw, Poland
Peter Schade
2008-04-18:
TPC prototype for ILC
Micro-Pattern Gas Detectors (RD-51) Workshop, Nikhef, Amsterdam
, Freiburg
Klaus Dehmelt
2008-03-04:
The LCTPC Large Protoype at the DESY Testbeam
TILC08
, Sendai
Klaus Dehmelt
2008-03-04:
Entwicklung und Bau eines großen TPC-Prototyps für den ILC
DPG-Frühjahrstagung 2008
, Freiburg
Peter Schade
2007-10-23:
Status of the Large TPC Prototype at DESY
ALCPG
Workshop 2007
,
FNAL
, Battavia, USA
Ralf Diener
2007-09-11:
The LCTPC Collaboration: Some Key Aspects of Activity
Workshop: Micro Pattern Gas Detectors. Towards an R&D Collaboration
, CERN
Klaus Dehmelt
2007-08-31:
Development and Construction of a Large TPC-Prototype for the ILC
International School of Subnuclear Physics
, Erice-Sicily
Peter Schade
2007-06-01:
Status of the Large TPC Prototype
LCWS 2007
, DESY, Hamburg
Lea Hallermann
2007-05-31:
Pad occupancy in LDC TPC with TDC-based readout electronics
LCWS 2007
, DESY, Hamburg
Alexander Kaukher
2007-03-09:
Ausleseelektronik für die Large-Prototype-TPC des ILC mit Zeit/Digitalwandlern
DPG-Frühjahrstagung 2007
, Heidelberg
Oliver Schäfer
2007-03-06:
Der Feldkäfig eines großen TPC Prototyps
DPG-Frühjahrstagung 2007
, Heidelberg
Peter Schade
2006-11-09:
The field cage for a Large TPC-Prototype
ECFA International Linear Collider Workshop 2006
, Valencia
Peter Schade
2006-11-08:
TDCbased readout electronics for a GEM TPC
ECFA International Linear Collider Workshop 2006
, Valencia
Alexander Kaukher
2006-09:
Eine Ausleseelektronik für die Large-Prototype-TPC des ILC mit Zeit/Digitalwandlern
38. Herbstschule für Hochenergiephysik 2006
, Maria Laach
Oliver Schäfer
Imprint
|
Data Privacy Policy
|
Contact
|
Sitemap
|
Recommend page
| © 2016 Deutsches Elektronen-Synchrotron DESY
Overview
NA1
NA2
TA (TA1, TA2)
JRA1
JRA2
JRA3
List of participants
List of associates
Reports
Memos
Templates
Official Documents
SC/IB - Meetings
EUDET-Meetings
EUDET related talks
Links
ILC agenda explanation
EUDET calendar
NEWS-2010
NEWS-2009
NEWS-2008
NEWS-2007
NEWS-2006